We have been advised of a request for a Temporary Road Closure at the above location to enable Bridge Installation Works to take place in safety.
Details below. The restrictions will be in operation only when the necessary signs are erected on site.
Road: A507 Stotfold Bypass, Stotfold
Reason: Lifting and placement of new bridge over the A507
Length affected: Full Length
The closure will be in place from 9pm on Friday 16th June to 5am on Monday 19th June